Maximize
Every Site
with Algoma

Enter an address and your complete feasibility is ready in under 60 seconds. Customized outputs give you control of the process.

The Platform

Feasibility in one search.

Enter an address and your complete feasibility is ready in under 60 seconds. Customized outputs give you control of the process.

01 — Site Search

Find Sites Everywhere

Development-ready parcels across all 50 states. Search by address, by criteria with 20+ GIS filters, or by drawing a boundary on the map.

Discover Opportunities
Set your criteria to find the perfect development sites
Location
Cross street, location, or address
Search Radius
Off
$ Sale Price Range ($)
Min
None selected
Max
None selected
📐 Lot Size (acre)
Min (acre)
None selected
Max (acre)
None selected
Zoning Types
Residential
Commercial
Mixed-Use
Industrial
Discover Sites
We'll show you sites that match your criteria within the selected radius
02 — Zoning Intelligence

AI Zoning Agent

Ask any zoning question. Get instant, cited answers extracted from a jurisdiction's municipal code.

Zoning Chat
Online — 1420 Peachtree St NE
Can I build a 20-story mixed-use tower here?
Yes — zoned MRC-3, allows up to 225 ft with FAR 6.0. A 20-story tower (~240 ft) would require a variance.📄 Atlanta Zoning Ord. §16-18B.008
What about parking?
MRC-3 has no minimum parking requirement. Full flexibility on ratios.📄 Atlanta Zoning Ord. §16-18B.012
Max unit density?
No density cap — governed by FAR, height, and setbacks. You could fit ~180 units on this parcel.📄 Atlanta Zoning Ord. §16-18B.010
Any affordable housing bonuses?
Yes — Beltline Overlay: 15% at 80% AMI unlocks +20% FAR and up to 275 ft. Covers 20 stories without a variance.📄 Atlanta Zoning Ord. §16-36.023
What are the setback requirements?
MRC-3 requires 0 ft front, 0 ft side, and 10 ft rear setbacks. Streetwall build-to zone of 5–15 ft along Peachtree.📄 Atlanta Zoning Ord. §16-18B.006
Is this in an opportunity zone?
Yes — Census Tract 13121-0021.02 is a designated Qualified Opportunity Zone. Capital gains deferral and 10-year exclusion available.📄 IRS QOZ Designation, 2018
03 — Map Layers

GIS Intelligence

Flood zones, wetlands, environmental overlays, opportunity zones, and 20+ GIS data layers, all visualized on a single interactive map. Custom layers available within 24 hours.

04 — Site Capacity

Generative Layouts

Site layouts for single-family and multifamily, in seconds, not weeks. The yield study your architect would take a month to deliver.

05 — Rendering

Instant Renderings

Generate photorealistic renderings from any angle you choose. Presentation-ready output eliminates rendering wait time during initial feasibility assessment.

06 — Rent Comps

Market Intelligence

Rent comps, demographics, supply pipeline, and submarket data, all in one view. Filter by proximity, recency, asset type, and unit size.

07 — Download

Export Everything

PDF Reports, CAD files, Rendering Images, and zoning summaries. Export what you need, in the format your team works in.

The Numbers

The old way vs. algoma.

Timeline
4–6 weeks
Timeline
0 seconds
Cost per study
$10–15K
Cost per study
Included
Scenarios
1–2 max
Scenarios
0+
Coverage
1 market
Coverage
0 states
What Developers Say

Built for the way you work.

"What used to take our team 3 to 4 weeks now happens in a day. I had a phenomenal experience with their team and site feasibility technology."
Scott Weathers
Development Manager, Advenir Development
"Algoma's technology has saved me a ton of time in the early phases and enabled me to move faster without reinventing the wheel every time."
Amerigo Contini
Principal, ACE Real Estate
"Their optimization algorithms have unlocked hidden revenue opportunities and provided us with a significant competitive edge."
Douglas Caraballo
Managing Partner, Everhome Living
Case Study — Everhome Living, Englewood, FL

The 47 units an architect missed.

Everhome's architect delivered a site plan. Algoma found 47 additional units on the same parcel — unlocking $27.7M in additional revenue.

+47
Additional units
$27.7M
Revenue increase
12,500x
ROI
Englewood FL case study rendering
Beyond the Platform

From Feasibility to Development

Algoma doesn't stop at analysis. Our professional team turns feasibility data into detailed site plan packages and high-fidelity renderings. We provide presentation-ready deliverables to get you ready for meetings with LPs, investment committees, community groups, and zoning boards.

01

Planning Packages

Zoning-aligned site layouts with parking, circulation, landscape, and infrastructure. Multiple scenario exploration from a single parcel analysis. Delivered in days, not months.

Detailed site plan aerial view
02

Design Packages

Algoma works with developers to develop single buildings or entire neighborhoods with unique product types. We design for a residents' experience and respond to environmental conditions while maintaining control over efficiency and cost.

Design package rendering
03

Development Packages

Work with us to take your projects through to completion. Algoma works with developers to manage the development process from start to finish. We tailor Development packages to your project's needs from the moment of search through construction administration.

Photorealistic rendering
Recent Projects

Featured Works

Run your first feasibility
in 60 seconds.

Enter any US address. Get zoning, capacity, market comps, and an investor-ready export — before your next meeting starts.

Get Started